SOP for Line Clearance of Packing Area

1. OBJECTIVE
To lay down the procedure to ensure line clearance before starting the activity in packing area

2. SCOPE
This procedure is applicable to Production, Quality Assurance and Quality Control Department

3. RESPONSIBILITY
• Production Incharge
• Manager/Officer QA

4. SAFETY INSTRUCTIONS
• N/A

5. PROCEDURE
5.1 Growing procedure is followed as per SOP.
5.2 Ensure that earlier product run up is completed and no tubes and batch documents lying on or near the machine.
5.3 Ensure overprinting metallic stereo of the earlier batch is removed from crimping assembly and follow the control as per SOP.
5.4 Ensure that secondary packaging material like – carton, insert remaining after batch completion are returned to the warehouse by making excess material return note, signed by Production Officer and Quality Assurance as defined in SOP.
5.5 Ensure that secondary packaging material like – carton, insert send to rejected scrap of the carton after put status label “SCRAP TO BE DESTROYED” and destroyed per SOP.
5.6 Ensure that status board displayed with mentioning product, Batch No and status with sign and date on packing area.
5.7 Ensure that the Conveyor Belt is cleaned as per SOP and “CLEAN” status label is fixed as per SOP.
5.8 Ensure that packing area is cleaned as per SOP.
5.9 Ensure that the return air riser filters are cleaned as per SOP.
5.10 Ensure that HVAC system is functional and environmental conditions are met.
5.11 Daily balance performance check and balance calibrated record are updated as per SOP.
5.12 Ensure that the preventive maintenance of machines has been carried out as per schedule.
5.13 Ensure that the secondary packing materials required for the batch are issued by warehouse.
5.14 Ensure that batch crimping metallic stereos of new batch are fixed to crimping stations.
5.15 Take out specimen on empty tubes duly checked and signed by Production Officer and QA Officer. Retain this specimen to BPR.
5.16 Line clearance shall be done by Production Officer in filling area, Checked and signed by Production Executive and verified and signed by QA.

6. RELATED DOCUMENTS
Format for Line Clearance in Packing Area – Annex. I

7. DISTRIBUTION INDEX
Original Copy will be retained by Quality Assurance Department.

DISTRIBUTION INDEX
Distributed To Copy No. Received By/Date
Quality Control Department 01 ,
Production Department 01 ,

8. ABBREVIATIONS
Q.A Quality Assurance Department
HVAC Heating ventilation and air conditioning
SOP Standard Operating Procedure

9. REVISION HISTORY

Revision No. Issue Date Supersedes Reason of Change / Description
          Revision No.              Dated     
00 10/08/2022 00                            N/A First Version